The Pre-Submission document is one of the stages in the production of the Christchurch and East Dorset Core Strategy. Public consultation on the document ran from 2 April 2012 for 12 weeks until 25 June 2012. The document can still be downloaded as a series of PDF files.

The consultation period ran from 2 April 2012 until 25 June 2012.  The comments that were made on the document during this period can be viewed using our online consultation system.

An Infrastructure Delivery Plan, along with a series of background papers, evidence studies and assessments were produced to inform the development of the Core Strategy Pre-Submission document.