Phase 1 of the Transforming Travel's Ringwood Road Ferndown cycleway scheme
Phase 1 of the Transforming Travel's Ringwood Road Ferndown cycleway scheme
Improvements along the 1.5km section of Ringwood Road between Longham Mini Roundabouts and south of Church Road (November 1 2021 to April 2022) include:
the existing footway on the western side of Ringwood Road will be upgraded providing a 3m-wide shared use path for walking and cycling between Pompeys Lane and Longacre Drive
the existing central island near Woodland Avenue will be widened providing a safe crossing point over Ringwood Road and access into Holmwood Park development with cycle signage through to Christchurch Road
six bus stop locations along the route will be upgraded, including accessibility improvements
the pedestrian footway and crossing point at St Just Close will be improved
the redundant speed camera on Ringwood Road, near Clifton Gardens, will be removed
the Ringwood Road/Casterbridge Road signal-controlled junction will be improved and provide enhanced facilities for pedestrians
the junctions of side roads on the west side of Ringwood Road will be revised giving more priority to people walking and cycling
improvements between Longacre Drive and Church Road will take place as part of phase three works